The RTT callback for a super-frame cycle uses the `arg` pointer to set
the message value that then is handed to the GoMacH thread. However,
in both instances the timer is scheduled the constant
`GNRC_GOMACH_EVENT_RTT_NEW_CYCLE` is provided. This means the argument
is not really necessary.